HILLSBOROUGH AMI SYSTEM RFP AND IMPLEMENTATION
Project Desciption
MC Engineering prepared an initial RFP for meter replacement with consideration of meter accuracy gains that was determined after the team prepared a water audit and conducted leak surveys of approximately 100 miles of mains using the Company’s acoustic leak detection equipment. The RFP was used to solicit pricing from leading AMI vendors with consideration of the Town’s unique topography and sites for AMI collectors. MC Engineering was then retained to provide construction management and oversee the installation of approximately 4,000 residential meters.